Skip to content

For your home

A ₹5,000 bill becomes ₹275

That is a 4.4 kWp system. About 8 panels on 330 sq ft. It pays for itself in roughly 4 years.

What you get

The parts nobody quotes on

The parts that decide whether a system lasts 25 years.

A structure rated for the site

Galvanised or aluminium, wind-rated for your roof. The line cheap quotes cut first.

Protection that actually protects

Surge and over-current protection, plus a proper earthing pit. This is what stops a fault becoming a fire.

DISCOM work done for you

Application, approval, meter, inspection, subsidy claim. All in your name, none of it your errand.

How it works

Survey to subsidy, in six steps

Four to eight weeks. Most of it is us chasing BESCOM.

  1. 01

    Site survey

    Day 1

    We measure the shade-free area, check the structure and your sanctioned load.

  2. 02

    Design and quotation

    2–3 days

    Array layout, shadow analysis, structural sizing, and a line-by-line price.

  3. 03

    DISCOM feasibility approval

    1–3 weeks

    We file it in your name and chase it. You never visit a BESCOM office.

  4. 04

    Installation

    2–4 days

    Structure, panels, inverter, cabling, earthing. Your power is off only for the final connection.

  5. 05

    Net metering and commissioning

    1–3 weeks

    Meter installed, system inspected, certificate issued. Now the meter runs backwards.

  6. 06

    Subsidy claim

    ~30 days after commissioning

    We submit the claim. The money lands in your bank account.

Before you commit

Work it out yourself

Six tools. No sign-up.

01

Solar calculator

Bill to system size, price, subsidy and payback.

02

Cost breakdown

Every line item on the bill of materials.

03

Subsidy checker

What PM Surya Ghar genuinely pays you.

04

EMI planner

Whether it pays for itself from month one.

All six tools

Questions people ask

Will solar eliminate my electricity bill completely?

It removes the energy charge, which is the large part. The fixed charge on your sanctioned load stays, along with duty — usually a few hundred rupees a month. Any calculator promising a literal zero bill is quietly ignoring the standing charge.

What happens to extra generation?

Under BESCOM net metering, units you export spin the meter backwards and offset units you import, one for one, over the settlement period. Generation beyond your total annual consumption earns little or nothing, which is why sizing far above your usage rarely pays.

Which system type should most homes choose?

On-grid, in almost every case where the supply is reasonably reliable. It is the cheapest per unit generated, pays back fastest, and qualifies for the full subsidy. Add a battery only if outages genuinely disrupt you — the battery is what makes hybrid substantially more expensive.

Why does my on-grid system shut down during a power cut?

Anti-islanding protection. If the inverter kept feeding the grid during an outage it could energise lines that linemen believe are dead. It is a safety requirement, not a fault, and every grid-tied inverter in India behaves this way.

Does solar work during the monsoon?

Generation drops on heavily overcast days but does not stop — panels work on diffuse light. Annual yield figures already average the monsoon in, so a well-sized system still covers a year of consumption. Rain also cleans the panels, which helps.

Start with your own numbers

Run your bill through the calculator. Send us the result and we will survey the roof.