Skip to content

What shapes your solar proposal

Understand the major components and services before comparing current quotes.

Exact amounts are provided in a current, survey-backed proposal.

Interactive proposal composition guide

kWp
1.0Drag to see how the proportions shift100.0
System type

Typical proposal composition

4.40kWp on-grid system

See which parts carry the most weight. Exact pricing is prepared after the roof, electrical scope and current equipment availability are confirmed.

Request a current proposal

Hover or tap any segment to see what it covers and its typical share of a proposal.

Typical proposal composition by category
CategoryTypical share
EquipmentPanels, inverter and, for hybrid systems, battery storage.43.5%
StructureThe mounting structure, coating and engineering required for the roof.11.1%
ElectricalProtection, cabling, earthing and the balance of electrical materials.10.7%
ServicesDesign, installation, testing, commissioning and approval support.26.6%
TaxApplicable GST on the supplied system and services.8.2%

How to read a competing quote

Solar pricing moves with equipment, roof conditions and installation scope. When you receive a current quote, these three questions help you compare it properly.

  1. 01

    Is the structure specified?

    Ask for the material, coating and wind rating. “MS structure” is not a specification. This is the line that most often absorbs a discount, and the one that fails first.

  2. 02

    Is net-metering liaisoning included, or extra?

    A quote that excludes DISCOM approval is not comparable to one that includes it, and the difference is rarely small once you are doing it yourself.

  3. 03

    Is GST inside or outside the number?

    A quote given ex-GST can look cheaper than an identical GST-inclusive quote. Always establish which basis you are being shown before comparing two proposals.

Questions people ask

How much does home solar cost in Bangalore?

A typical 3–5 kW rooftop system runs roughly ₹1.8–3 lakh installed before subsidy, depending on size, mounting and whether you want battery backup. The PM Surya Ghar subsidy returns up to ₹78,000 of that. Our cost breakdown page publishes the full bill of materials so you can see exactly where the money goes.

Is GST included in your prices?

Yes. Every figure on this site is GST-inclusive, which is how we quote — what you see is what you pay. If you are comparing against another quote, check whether theirs is inclusive too; an ex-GST number looks about 9% cheaper for no real reason.

Why does a smaller system cost more per watt?

Site survey, DISCOM liaisoning, transport, design and commissioning cost roughly the same whether the system is 2 kW or 5 kW. Spread over fewer watts, those fixed costs raise the per-watt price. It is the honest reason a 2 kW system is not two-thirds the price of a 3 kW one.

Can I get a loan for rooftop solar?

Yes. Under PM Surya Ghar, systems up to 3 kW qualify for a collateral-free loan at a concessional rate through participating banks, currently around 9.5%. Larger systems are financed at ordinary retail rates, and several lenders treat rooftop solar as a secured home-improvement loan.

What is the cheapest line to cut, and should I?

Mounting structure and protection equipment are where corners get cut most often, because neither shows up in the first year. An undersized structure fails in a storm and takes the panels with it; inadequate surge protection turns a fault into a fire. The modules and inverter are visible on any quote, so they are rarely where the saving comes from.

Now see what it saves you